Does the MCESD sign the cover page of the design drawings?
The cover page of the design drawings is signed by the Swimming Pool Program staff for projects which involve the construction of or modification to a public and semi-public pool, wading pool or special use pool, spa or artificial bathing lake and require an Approval To Construct.

An approval area for the MCESD should be provided on the cover page with space reserved for the following information:
- Approval By: (Signature)
- Approval Date:
- Project Number:

Show All Answers

1. What types of projects are reviewed by the Swimming Pool Program?
2. Who can prepare a project?
3. How do I submit a project for approval?
4. Whom should I contact if I have a question about submitting a project?
5. How can I obtain application and instruction forms?
6. What type of documentation needs to be included in my project submittal package?
7. Are electronic (digital format) documentation submittals accepted?
8. What types of documentation must be sealed by a Professional Engineer or Architect?
9. What format and how many copies of the documentation should be submitted?
10. Does the MCESD sign the cover page of the design drawings?
11. How much will it cost to get my project approved?
12. What happens after I have submitted my project?
13. How long will it take to get my project reviewed and approved?
14. Is there any way to expedite the review of my project?